The 980 million Nanjing OLED lighting project will be put into trial operation on Q3

[High-tech LED News] The OLED lighting project jointly invested by the former senior researcher of Kodak Company, OLED lighting experts Wang Jinshan, Dr. Tian Yuansheng and other related investors will start operation in the 2011 Q3 test line.

It is reported that the registered name of the joint venture company is Nanjing Dihao Organic Optoelectronics Co., Ltd., with a total investment of RMB 980 million. It is mainly engaged in R&D, production and sales of OLED lighting panels and lamps.

The project is scheduled to be put into production in the Q2 quasi-four-generation production line in 2012. At the end of 2012, the first batch of OLED lighting panel mass production and lighting fixtures will enter the market. By the end of 2013, a large-scale OLED lighting panel and lighting production line with independent intellectual property rights and world-leading will be built. It will also build a leading international OLED lighting engineering technology research center.

A battery pack built together with a Battery Management System with an external communication data bus is a smart battery pack. A smart battery pack must be charged by a Smart Battery Charger.

Main functions of BMS: capacity forecast, over current, over voltage, over charge, over discharge, over-temperature protection, single voltage balance, abnormal alarm, CAN-BUS communication, programmable parameters.

Bms For Lifepo4 Battery

Lifepo4 Battery Management System,Lifepo4 Bms,12V Lifepo4 Bms,Bms For Lifepo4 Battery

Xinxiang Taihang Jiaxin Electric Tech Co., Ltd , https://www.chargers.be