100W LED High Bay and Tunnel Light

Model NO.: BST-100WoH
Input Voltage: 100-270VAC, 50/60Hz
With Light Source: With Light Source
CCT: 3000-6500K
Power Factor(PF): >0.95
Driver: Meanwell
CRI: Ra>70
Luminous Flux: up to 140lm/W by 3030, +/- 5%
Optional Beam Angle: 30°/60°/90°
Trademark: Besturn
Transport Package: Carton
Specification: Φ 248*138mm
Origin: China
HS Code: 94054090
Model NO.: BST-100WoH
Input Voltage: 100-270VAC, 50/60Hz
With Light Source: With Light Source
CCT: 3000-6500K
Power Factor(PF): >0.95
Driver: Meanwell
CRI: Ra>70
Luminous Flux: up to 140lm/W by 3030, +/- 5%
Optional Beam Angle: 30°/60°/90°
Trademark: Besturn
Transport Package: Carton
Specification: Φ 248*138mm
Origin: China
HS Code: 94054090
Overview
 
100W LED High Bay and Tunnel Light





Electrical Specifications

 
100W LED High Bay and Tunnel Light







Packing & Delivery
Packing Details : Inner plastic bag,outside carton box,last is the pallet,all are based on the customers' requirments
Delivery Details : 10-30 days after you confirm the samples
Payment terms: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.If you have another question, pls feel free to contact us.

 
100W LED High Bay and Tunnel Light

Our Company
Yangzhou Besturn International Trade Co.,Ltd. was established in 2007, mainly exported lighting products. And in 2012 established a R&D center in HK, at same time, it invested in local factory and build it's own production bases in Shenzhen, Guangzhou, Ningbo and Yangzhou.
Our LED products now widely exported to Europe, Mid-East, North American & South American. Our main product has pass CE, Rohs, UL, ETL... Quality first is always our aim.

 
Why Choose US
1. For all your inquires about us or our products, we will reply you in details within 24 hours.
2. We own well-tranied and passional sales & after- sale services who can speak fluent Engligh language.
3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.
4. Shipping port: Shenzhen, China mainland.
5. Discouts are offered based on order quantities.

 Engineering example
 
100W LED High Bay and Tunnel Light
FAQ 

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 
2. Question :  Why choose cooperate with us ?  

Answer :     -- Right people, Right product, Right price ;
                    -- Company-wide customer awareness ;
                    -- Reliable Quality and All components from world leading suppliers ;
                    -- Cost-effective export infrastructure and total supply chain management ;
 
3. Question : How does your factory do regarding quality control ?  

Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 
4. Question : What is the average delivery time ?  

Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 
 
 
Overview
 
100W LED High Bay and Tunnel Light





Electrical Specifications

 
100W LED High Bay and Tunnel Light







Packing & Delivery
Packing Details : Inner plastic bag,outside carton box,last is the pallet,all are based on the customers' requirments
Delivery Details : 10-30 days after you confirm the samples
Payment terms: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.If you have another question, pls feel free to contact us.

 
100W LED High Bay and Tunnel Light

Our Company
Yangzhou Besturn International Trade Co.,Ltd. was established in 2007, mainly exported lighting products. And in 2012 established a R&D center in HK, at same time, it invested in local factory and build it's own production bases in Shenzhen, Guangzhou, Ningbo and Yangzhou.
Our LED products now widely exported to Europe, Mid-East, North American & South American. Our main product has pass CE, Rohs, UL, ETL... Quality first is always our aim.

 
Why Choose US
1. For all your inquires about us or our products, we will reply you in details within 24 hours.
2. We own well-tranied and passional sales & after- sale services who can speak fluent Engligh language.
3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.
4. Shipping port: Shenzhen, China mainland.
5. Discouts are offered based on order quantities.

 Engineering example
 
100W LED High Bay and Tunnel Light
FAQ 

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 
2. Question :  Why choose cooperate with us ?  

Answer :     -- Right people, Right product, Right price ;
                    -- Company-wide customer awareness ;
                    -- Reliable Quality and All components from world leading suppliers ;
                    -- Cost-effective export infrastructure and total supply chain management ;
 
3. Question : How does your factory do regarding quality control ?  

Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 
4. Question : What is the average delivery time ?  

Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 
 
 

French Plug Insert

French Plug Insert,Plug Insert,Electrical Plug Types,Plug Converter

Power Cable Socket Lamp Co., Ltd. , http://www.nbpowercables.com