SYL-17 hollow glass dew point meter use method - Database & Sql Blog Articles

MOS Power IC Full Range
Probe KG-250G Switch Needle Head Diameter: 3.0mm, Spring Exposed Switch Needle
Photocoupler

SYL-17

Insulating Glass Dew Point Meter

One,

SYL-17

Insulating Glass Dew Point Meter

In accordance with

GB/T 11944-2002

"Insulating Glass Standard" method for dew point testing.

Manufactured using electronic refrigeration technology, digital temperature display, easy to operate, and intuitive interface.

.

Two,

SYL-17

Insulating Glass Dew Point Meter

Instructions

※

Must be used before use

Must be opened

Ring the water to ensure that there is circulating water in the pipeline, and all the cables can be plugged in before powering on. After the equipment is tested, first turn off the power and then turn off the circulating water. Please follow the instructions, otherwise the customer will be responsible for the consequences of improper operation.


l

Connect the temperature sensor and the voltage regulator plug to the corresponding plug of the hole dew point display.


The main power plug is inserted into the corresponding jack, the power switch is turned on, and the indicator light is on.


often.


2

Press

"

Water Supply

"

Button, system works, automatically adjusts the temperature according to the set temperature

(-62

°C

)

.


3

When the temperature reaches the standard required temperature, please press the timer

"RST"

Key, the system automatically starts timing according to the set time. After the time arrives, the alarm buzzer alarms and works.


The indicator light is off.


4

After the test is completed, the system is powered off first, then the external circulating water is turned off.


Pressure Gauge Without Capillary

ZHOUSHAN JIAERLING METER CO.,LTD , https://www.zsjrlmeter.com