Maintenance and maintenance of oxygen bomb calorimeter

Oxygen bomb calorimeter is also called oxygen bomb calorimeter. The calorific value analyzer mainly applies test materials, such as coal, carbon, fuel, cement, waste materials, etc., in the process of burning, which is currently in the emerging material analysis and research. Especially in colleges and universities, research laboratories are widely used. The oxygen bomb calorimeter is used in operation from the original simple Beckman thermometer to the digital display, the microcomputer type until the fully automatic series, not only The test time is greatly shortened, and the test accuracy is greatly improved. In the process of using the oxygen bomb calorimeter, the actual operation of the oxygen bomb plays an important role. If you do not pay attention to some problems, it will cause the ignition to be unsuccessful, resulting in failure of the whole experiment and even serious consequences. Therefore, pay special attention to the following aspects during the use of oxygen bombs.

Oxygen bomb daily maintenance and inspection:

The following inspections and maintenance should be carried out frequently after the end of the test, so that the instrument can always be in good working condition and can prolong the service life.

1. Oxygen bomb:

In addition to cleaning and drying the oxygen bomb after each test, the following points should also be noted and checked:

(1) The oxygen bomb can only be twisted by hand. When the hand feels resistance, it should stop. Do not use tools to harden it. After the test is completed every day, it should be cleaned once.

(2) The cap and seat should be rinsed and dried after use.

(3) Rinse the cup, scrub the thread, and check if there is mechanical damage on the cup. Be careful not to invert the cup.

(4) Check the seal for wear and damage during combustion. If the seal is not tight and there is air leakage, it should be replaced.

(5) Check whether the insulation mat and the insulation sleeve are good, whether there is any damage, and the insulation performance can be checked regularly.

(6) Regularly carry out a 20.0 MPa water pressure test on the oxygen bomb. After each water pressure test, the oxygen bomb should not be used for more than one year (or no more than 5,000 tests).

2. Calorimeter: After the test is finished, the water in the cylinder should be drained to the outer cylinder, wiped dry and kept clean.

3. Test water: It is best to use pure water, and it should be replaced regularly to ensure the reliability and success rate of the test.

Note: In order to use the system safely, the computer equipment must be reliably grounded

Residual Current Circuit Breaker With Over Load Protection

TWO FUNCTION : MCB AND RCCB FUNCTIONS

leakage breaker is suitable for the leakage protection of the line of AC 50/60Hz, rated voltage single phase 240V, rated current up to 63A. When there is human electricity shock or if the leakage current of the line exceeds the prescribed value, it will automatically cut off the power within 0.1s to protect human safety and prevent the accident due to the current leakage.
leakage breaker can protect against overload and short-circuit. It can be used to protect the line from being overloaded and short-circuited as wellas infrequent changeover of the line in normal situation. It complies with standard of IEC/EN61009-1 and GB16917.1.


RCBO,ELCB,Leakage Circuit Breaker,Residual Current Circuit Breaker,Residual Current Circuit Breaker with Over Load Protection 1p,Residual Current Circuit Breaker with Over Load Protection 2p

Wenzhou Korlen Electric Appliances Co., Ltd. , https://www.zjthermalrelay.com